VRM optimisation

Published 29 July 2015


Most new cement plants utilise vertical roller mills (VRM) for raw material grinding and preparation. Taking a step-by-step look at the entire roller milling process, Kline Consulting recommends routine measurements and discusses ways to overcome chemical issues to optimise operations.

A closer look at VRM efficiency and optimisation

The vertical raw mill has several advantages over previously-used mill systems including:
• lower power consumption
• less part wear/consumption
• incorporation of drying with waste heat.

Previous technologies included ball mills with higher power consumption and part wear rates, and were not capable of higher levels of raw material drying. Double rotator mills, an off-shoot of ball mill technology, allowed for a higher level of drying, at the expense of good air and material sealing.

To continue reading this story and get access to all News, Articles and Video sections of the CemNet.com website, please Register for a subscription to International Cement Review or Login