Dear all

Our clinker designed with SR 2.5, LS 95.5. C3S according to calculation is arround 58%. If we wan to increase C3S upt to 62%, can we reduce SR and increase LS a bit without mineralization? Are there any problem with kiln operation and cement quality?

Anybody can share with me about this idea.

Thanks

Tam