Dear Experts,

The chemical analysis of clinker by XRF is showning 5.0 % C3A, where as the same sample analysed by XRD shows C3A cub: 1.5 % & C3A orho: 2.10%. why is the difference so. Also our initial setting time of cement is very higy (350 mts). To control initial setting time Alumina content increased by 0.50 % in clinker, even then there is no chnage in initial setting time and C3A phase in the XRD.

Your suggesions are invited for increasing the C3A phase in XRD and also controlling the initial setting time or any other suggesions to control initial setting time are highly appreciated.