
Please can i have the same data for , mono compartement ball raw mill with 35 rings 15 are lifters and the rest are classifiers (Diameters 5 and length 9)
, Also our maximum ball size is 90mm and lower is 40mm
also what is the best compensation while production is 210t/hr and wear rate is 65gm/ton

Please can i have the same data for , mono compartement ball raw mill with 35 rings 15 are lifters and the rest are classifiers (Diameters 5 and length 9): Designing it as a second chamber you will have:
Also our maximum ball size is 90mm and lower is 40mm:
90 mm 7.2%, 80 mm 7.5%, 70 mm 10.8%, 60 mm 16.4%, 50 mm 27%, 40 mm31.1% according to Bombled.
Also what is the best compensation while production is 210t/hr and wear rate is 65gm/ton:
Assuming 20 hour per day and 330 dys per year:
65 g/ton x 210 ton/day x 20 h/day x 330 day/year / 1000000 ton/g = 90.1 ton per year
with the composition of 90 mm 15%, 70 mm 35%, 50 mm 50% of the 90.1 ton ball
Hope it helps.