dear all'
we are having 1400 tpd kiln. After a 90 days stopage , our production rate does not getting fullfill for a along time.kiln is not able to run with more than 70% raw meal feed. so anyone can help us for finding the solution.
thanks
kkm:dear all'
we are having 1400 tpd kiln. After a 90 days stopage , our production rate does not getting fullfill for a along time.kiln is not able to run with more than 70% raw meal feed. so anyone can help us for finding the solution.
thanks
What is the bottleneck kkm. I mean what problem are you facing when the production is increased beyond 70% of raw meal feed?