Dear Ted,

We just commisioned our dual firing project (Gas and Coal) in one of our plants. We therefore need to set up a coal lab.

1. What equipments do we need?

2. Is it just four parameters we need to test for (VM, Ash content, Residue and Moisture)

3. What duration of time should we gap the analysis?

4.Can we use same furnance for coal and LOI?

Thanks in advance