Dear expert

in existing condition

my clinker with 66% C3s,15 to 16% C2S, 1% free lime and >95% LSF in clinker,

My clinker factor in Lime stone pozzolonic cement is 58%,(Cement composition is 8% Slag,20 % limestone,10 % Pozzolona rest is gypsum). My 3 day strength 28 to 30 MpA( EN stand.) and 28 day strength is 44 MpA.

now in this situation if we go for higher mic addtion( which my national standard allow next 3% more), drop in 28 days strength very high.

can you please comments in this situation what should be my action for maintaing the later strength with more MIC %.

our cement residue in the ramge of 3 to 4% on 45 mic. blaine 4000 cm2/gm.

in microscopy we face problem very low size of alite content with very high %, please comments also what should be my action in kiln or cooler for control the size of alite in clinker as well as % of alite and belite in clinker.?

 

thanks

regards

raju verma