DEAR ALL
AS I AM NEW IN THIS FORUM.
I WANT TO KNOW WHAT ARE THE COSTINGS INVOLVED IN CALCULATING THE PPC PRODUCTION & OPC PRODUCTION?
HOW CAN I COMPARE BOTH AS IT IS SAID THAT PPC IS ECONOMIC WITH RESPECT TO OPC ?
I THINK IT INCLUDES THE RAW MATERIAL COST LIKE CLINKER,GYPSUM & FLYASH.
NOW HOW TO KNOW THE DIFFERENCE IN THE GRINDING COST?
FOR EXAMPLE MY CLOSED CKT MILL DELIVERS 100 TPH IN OPC AT 2800 BLAINE.
WHAT WILL BE THE OUTPUT IN PPC IF I ADD 25 % FLYASH?
BLAINE FOR PPC IS 4000 .
PLEASE TELL ME IN AN EXCEL FORMAT SO THAT I CAN CALCULATE THE SEPARATE COST FOR PPC & OPC PRODUCTION.
THANKS
WAITING.............
PRAKASH