The problem is from reaction of cement dust with moisture in BH.
Here are some rules:
- Good insulation (100 mm, rain water tight)
- Avoid cold spots/bridges
- Minimum 20°C above water dew point
You should install heaters on the BH and heat it before use to eliminate moisture in BH.
Also the following are helpfull:
§First Filter Start-up:
Do Pre-coating with approx. 200 g/m2 inert material
(e.g. CaCO3, Ca(OH)2)
e.g. bag filter with 5’000 m2 bag surface à 1 ton raw meal being injected upstream of the bag filter into the gas duct by a rented silo truck equipped with an on-board compressor
§Short Stop (hours up to max. a few days):
deactivate cleaning cycle before stopping the filter
§Long Stop (several days to weeks):
clean down the filter as much as possible and do pre-coating before restarting the filter