Cement Quality
Dear Sir,
We are facing problem of quick setting of concrete .
Consistency of cement has increased from 30 to 45 %
we have checked gypsum its ok, PI (Lime stone ok ,clinker ok )
We blaine is 3300 to 3500 )
Residue on 90 micron is zero and on 45 micron 12 %.
when in 1:1:2 ( 1 cement: 1 sand and 2 graval ) more water is added for free flowing it looks very creamy and slowly sets and hair line cracks appera. 3 days 7 days strength are ok.
please advise
Know the answer to this question? Join the community and register for a free guest account to post a reply.
3 posts
re Cement Quality
Try to reduce blain to 2900 -3000
2 posts
re Cement Quality
Cement quick setting:
- check the laboratory (Is the blaine value correct?)
- check the alkali content in clinker (problem with false set and optimal gypsum level)
- if it is possible check the semy-hydrate gypsum content (Had the process engineer changed something i.e. mill outlet temperature e.t.c.?)
Cement water demand:
- check the laboratory (is the blaine value correct?)
- check the PSD less then 3 micron (is it increased?)
Concrete quick set:
is the chemical-additive used for concret? You should take the archived sample from laboratory for the non-problematic period (it should be storaged) and check the concrete chemical-additive.
Regards