1 posts
TimePosted
15/02/2020 06:59:10
Annu
says
Hood drafting control
Dear sir,
Cooler duct diameter from cooler to ESP was increased from 2240 mm to 3000mm in existing plant.After starting plant hood drafting is not controlled.What should do.
Know the answer to this question? Join the community and register for a free guest account to post a reply.
74 posts
Page
1
of
1
1