High chloride in hot meal

Dear Xpert,

Please tell I am getting high chloride in hot meal upto 1.6% .

With the same raw material, AF & burning conditions.

Means raw material input chloride, fuel chloride, AF chloride is same.

I have to reduce AF tph from 6tph to 1.5 tph only and some needs to stop due to high chloride in hot meal upto 1.7% .

Preheater dust is not recycled .Any problem with burner or Preheater or any other system .

Please reply

Siddharth

 

Reply


Know the answer to this question? Join the community and register for a free guest account to post a reply.

Michael Clark
324 posts
TimePosted 24/04/2022 11:33:13

re High chloride in hot meal

This is a common problem. Chloride typically concentrates to 100x the inputs in the hot meal. Only a slight variation in the chloride content of raw materials or fuels can lead to hot meal chloride above 1.5% and potentially sticky hot meal and preheater blockages. You need to install a kiln inlet bypass if you want to burn high quatities of alternative fuels. 

Reply

xxxx
239 posts
TimePosted 03/05/2022 13:03:52
xxxx says

re High chloride in hot meal

Dear Sir,

How chloride gets out from the system ?

As its evaporation is almost100% , then how much we get it out in clinker.

As its evaporation takes place around 700 to750m deg & it never condenses, then how can we remove it from the kiln system.

in chlorine bypass why it is cooled by air then sent for pptn in ESP or BH?

Please share calculation sheet for chloride balance in a kiln system.

rajmadhuri1972@yahoo.co.in

Reply

gks
153 posts
TimePosted 17/05/2022 13:26:04
gks says

re High chloride in hot meal

Dear Team,

After your AFR  action . Kiln operation  will improve . But if having margin your  Ph fan. first improve  O2 level. After smooth operation cl coating wash out from  system. Pl share hot meal  component. ( S03, K2O,Na2o,CL) with clinker component. If having problem in flame shaping . Pl make short flame. Add lime stone  bolder at kiln inlet for break CL2 cycle two time per shift. you may contact on Mobil +91  9926903725 

Regards,

Gireesh Sharma