Dear guys
we've recently been tasked with designing a gypsum crushing system for a client. Due to space limitations, the client has asked for a cantilever belt conveyor with an unobstructed area beneath and a maintenance-friendly walkway.
The crusher is 3.8m tall. The client is currently deliberating on the most cost-effective method to feed the crusher: constructing a slope, using steep-angle belts, or considering a downward excavation. What are your thoughts on this?
Email: brian@darko-tech.com
WhatsApp: +86 15365564889
Attached files
p1.png