Ciments Calcia opened a new distribution centre in the 13th arrondissement of Paris, France, on 4 July 2014, designed by Vib Architecture.

The centre consists of two 20m dia silos that rise to a height of 37m. A third cylinder, which has a cut-out design includes a lift and a wrap-round metal staircase. The facility, which was cast in slipform, took three weeks to build.