Engineering firm thyssenkrupp has signed a deal with HeidelbergCement to install a new 4500tpd kiln line at the latter's Schelklingen plant in Baden-Württemberg. The new line is set to come into operation in spring 2018.
Lothar Jungemann, CEO of the Cement operating unit in the Resource Technologies business unit of thyssenkrupp Industrial Solutions: “Although most of the cement contracts we have been awarded recently have been to build new production capacities in growth regions, this order shows that there is also demand in Europe to modernize and expand existing facilities. Our highly efficient technologies, which we continually improve together with our customers, guarantee maximum reliability and allow producing innovative products in an economical and environmentally friendly way.”
For the new kiln line thyssenkrupp Industrial Solutions will supply state-of-the-art components including a 5-stage, single-strand DOPOL preheater, a POLRO rotary kiln with a POLGUIDE drive system and a POLYTRACK clinker cooler with roll crusher. The innovative design of the calciner used in the preheater will ensure outstanding fuel burnout with low nitrogen oxide emissions. The POLYTRACK cooler also features a highly efficient heat recovery system that minimizes fuel input.
Published under Cement News