Russia’s Eurocement has ordered three more VRMs for its Akhangaran project in Uzbekistan from Germany-based Gebr Pfeiffer. The order includes an MVR 5000 R-4 for raw material grinding and two MVR 5000 C-4 models for cement grinding.
The MVR 5000 R-4 has a total drive power of 2500kW and can grind 500tph of raw material to a fineness of 12 per cent R 90µm. The cement grinding mills, each with an installed drive power of 4000kW, are designed to grind 200tph of OPC at 3200 Blaine.

Gebr Pfeiffer wins Go4ZERO mill order
Gebr Pfeiffer has received an order to supply a vertical roller mill of the type MVR 5000 R-4. T...