Cement News tagged under: New orders

RSS feed

FCT Combustion wins Ash Grove burner project and other cement orders

20 March 2019, Published under Cement News

FCT Combustion has won a contract to convert both kilns at Ash Grove Cement's Louisville plant, NE, USA to natural gas firing. The supply will include Gyro-Therm™ MKII burners, natural valve trains for both kilns and NFPA 86 BMS for both kilns.
 FCT Combustion has also announced a list of its recently completed and ongoing orders for the cement industry. These include:

 • Nova Cimangola – a project to convert its 5000tpd kiln to oil firing. This project will see the supply of a main multi...

Unitherm-Cemcon delivers MAS burner to Argentinian plant

20 February 2019, Published under Cement News

Unitherm-Cemcon has delivered firing equipment to a cement plant in Argentina, following completion of the factory acceptance test (FAT) and successful inspection of the goods by an inspection company. The burners and accessories are part of a preheater upgrade to increase kiln capacity and solid secondary firing. The scope of supply included: • one rotary kiln burner MAS/7/KO EG X (fuels: coal, natural gas, solid secondary fuel) with a nominal capacity of 114MW • flame monitoring device ...

Cemengal wins second grinding station order with ACICO Cement

04 February 2019, Published under Cement News

Cemengal has been awarded with a new contract for the supply of a second cement grinding station to ACICO Cement consisting of a complete cement mill workshop. The main equipment to be included within this new contract is related to a 5200kW ball mill fully engineered by Cemengal of Spain with all the peripheral equipment and a fourth-generation classifier from Magotteaux XP4i-130 for high-strength cements. The projected grinding capacity will be 1Mta of cement and the plant will be commiss...

Dangote Cement

31 January 2019, Published under Cement News

Dangote has placed several orders with the Aumund Group for its projects in Nigeria and Senegal. For the Obajana Line 5 and Okpella plants in Nigeria, both 6000tpd, Aumund is supplying a total of six belt bucket elevators and four pan conveyors. In addition, Schade Lagertechnik, also part of the Aumund Group, will supply two stackers, two portal reclaimers and additional stockyard equipment. Aumund Beijing has also received orders from Dangote for the cement producer’s Apapa project and its ...

FLSmidth signs contract for 5000tpd Ethiopian plant

24 January 2019, Published under Cement News

FLSmidth has signed a contract with Abay Industrial Development SC for a greenfield cement plant near Dejen, Ethiopia. The order is valued at around EUR100m and includes the delivery of design and engineering, full equipment supply, automation systems, installation and commissioning, as well as training and extended supervision. The project is expected to be completed in the second quarter of 2022 and, once fully operational, will have a capacity of 5000tpd. "This greenfield plant will...

Aumund wins Sinoma orders in Nigeria and Senegal

17 January 2019, Published under Cement News

Aumund Group has received several new orders from Sinoma Nanjing NDI for cement plants in Nigeria and Senegal, while Schade Lagertechnik, part of the Aumund group, has received an order for several pieces of equipment for two Dangote Cement projects in Nigeria. For each of Dangote's two 6000tpd plants, Obajana Line 5 and Okpella, Aumund will supply three belt bucket elevators with a capacity of 660tph to convey raw meal, and to feed raw meal to the preheater towers at 520tph. Three furthe...

Bedeschi to supply material handling equipment for Italian plant

11 December 2018, Published under Cement News

Cementeria Costantinopoli has ordered equipment for handling raw material and clinker handling from Bedeschi for its cement plant in Barile, Potenza, Italy. Bedeschi will supply a storage system for clinker with a No1 bridge stacker type STK P with a capacity of 100tph and a No1 bridge reclaimer type BEL C with a capacity of 130tph. The supplied machinery will also include a15m-long and 60m-long belt conveyor. 

Loesche wins coal mill orders from Guangdong Tapai Co Ltd

18 October 2018, Published under Cement News

Loesche is delivering two vertical roller mills (VRMs) to Guangdong Tapai Co Ltd for its two 10,000tpd clinker lines in Jiaoling, Meizhou, Guangdong province, China. The two LM35.3 D mills are a repeat order of that received by the company in 2015. The mils will grind pulverised coal at 50tph to a fineness of three per cent with a sieving residue of 0.08mm. They have an installed power of 1200kW. The two new Loesche coal mills are expected to be delivered in April 2019. Guangdong T...

Limak Çimento to receive Aumund equipment

17 October 2018, Published under Cement News

Aumund has won a contract by Simona EE Overseas Development to deliver an order or material handling equipment for Limak Çimento Sanayi ve Ticaret, in Turkey. The order comprises three bucket elevators, five chain bucket elevators, seven pan conveyors and five drag chain conveyors. Dispatch is scheduled for the end of this year. The Aumund bucket elevators will have a conveying capacity of 500tph and the chain bucket elevators will transport materials more than 30m with capacities of 7...

Loesche receives order for three VRMs in China

02 October 2018, Published under Cement News

Loesche has received an order from Sinoma (Suzhou) Construction Co Ltd to supply three VRMs for China’s Lubao Cement Co. The mills will form part of the company’s 4500tpd plant currently under construction in Bei Liu, Guang Xi. One 450tph four-roller mill will be used to grind raw material to a fineness of 12 per cent with a sieving residue of R80μm. Another mill with a throughput of 200tph will be used to grind clinker to 3400-3600 Blaine. The final 42tph three-roller mill will be used to ...