I am looking to get feedback for the following cement mill for a white cement plant.  The first compartment has lifting liners and the second compartment has lifting at the beginning followed by classifying liner. The mill dimension is as follows:

Mill Diameter:

3.4  

m

Mill Length:

11.0  

m

First Chamber Effective Diameter:

3.23  

m

First Chamber Effective Length:

2.3  

m

Second Chamber Effective Diameter:

3.27  

m

Second Chamber Effective Length:

8.0  

m

Input clinker sieve analysis:

mm

Clk

25.40

1.90%

19.00

3.50%

12.70

10.10%

9.50

19.50%

8.00

-

6.35

45.10%

4.76

63.40%

2.38

85.30%

1.19

94.60%

0.84

97.40%

0.60

98.10%

And the existing ball charge design:

First Chamber Ball Charge

Ø  Ball  [mm]

Weight  [ t ]

Percent  [%]

90  

6.5  

23  

80  

8.0  

29  

70  

5.8  

21  

60  

5.9  

21  

50  

1.8  

6  

Total:

28  

100  

Average ball weight

[ g ]

1665  

Spec. media surface

[m2 / t]

9.7  

Volume Load

[%]

34.0  

Second Chamber Ball

Ø  Ball  [mm]

Weight  [ t ]

Percent  [%]

50  

8  

8  

40  

7  

7  

30  

6  

6  

25  

22  

22  

20  

55  

56  

Total:

98  

100  

Average ball weight

[ g ]

46  

Spec. media surface

[m2 / t]

32.7  

Volume Load

[%]

31.3  

 

   The longitudinal sieve analysis is as follow:

Using the Clk sieve analysis I calculated that the maximum ball required will be:

INPUTS: (Input Shaded Area Values)

Wi =

13.49

s =

3.09

D80 =

11000.00

D =

3.22

Mill Speed

17.20

K=

335.00

Calculated Values:

Critical Speed =

23.57

Pc =

72.97

 Can you please tell me your opinion the mill charge composition and longitudinal analysis?

Should the mill feeling degree be decreased? What about the max ball used?

How can we increase production in this mill?

I appreciate all your comments and feedback.

Thx