Ciments du Maroc will be investing MAD170m (US$20.7m) in a new grinding unit in Jorf Lasfar, 110km southwest of Casablanca.
The grinding centre will have a capacity of around 0.45Mta. Located 5km from the port of Jorf Lasfar, the facility will include a horizontal cement mill, two rotary eight-nozzle bagging machines, automatic truck loading and two bulk loading stations. Storage for raw materials will include 2 x 4000t of clinker, 2200t of limestone, 1200t of gypsum and 800t of fly ash. Cement will be stored in four 1000t silos.
The Italcementi-owned company is taking the step in anticipation of the merger between Lafarge and Holcim and is part of a reorganisation of its Moroccan subsidiaries. "The construction of the Jorf Lasfar grinding centre, which is situated on a 6.4ha site, aims to strengthen our industrial base ," said the group.
Sign up for our Daily News Service
Our editors' pick the top news delivered to your inbox each day.
Sign up for the daily email