India Cement Limited (ICL), a cement company operating in Tamilnadu is planning to set up a 48 MW coal based CPP at Narnamalpuram village, in the Tirunelveli district of Tamil Nadu. The proposed CPP will be set up over an area of 10.99 acres. It will have a circulating-fluidised-bed-combustion boiler unit of 48 MW capacity, to be fuelled with coal. Published under Cement News
India Cement Limited (ICL), a cement company operating in Tamilnadu is planning to set up a 48 MW coal based CPP at Narnamalpuram village, in the Tirunelveli district of Tamil Nadu. The proposed CPP will be set up over an area of 10.99 acres. It will have a circulating-fluidised-bed-combustion boiler unit of 48 MW capacity, to be fuelled with coal. Published under Cement News
Sign up for our Daily News Service
Our editors' pick the top news delivered to your inbox each day.
Sign up for the daily email