Polysius is to build a new 2500tpd kiln line for Ciplan Cimento Planalto SA at the Sobradinho cement factory, situated about 22km northeast of the Brazilian capital city of Brasilia.
The six-stage DOPOL® preheater with PREPOL®-AS calcining system and 4.0m x 60m rotary kiln is due to go into operation at the end of 2010. This is already the third kiln line constructed by Polysius in Sobradinho.