Sichuan Ya-Dong Cement Co. and Jiangxi Ya-Dong Cement Co, PR China, awarded KHD Humboldt Wedag, Germany the orders for engineering and supply of two new production lines, each with a designed capacity of 4200tpd clinker. Jiangxi Ya-Dong and Sichuan Ya-Dong are members of the Asia Cement Group, Taiwan.

Based on the successful installations of line 1 and 2 at Jiangxi plant near Ruichang City, PR China, (which have been operating since July 2000 and September 2003 and equipped with KHD cement process technology), the client decided to place the orders for two identical new cement production lines also with KHD Humboldt Wedag:

• Jiangxi Cement Plant, Ruichang City
production line 3, designed capacity 4200tpd clinker.
• Sichuan Cement Plant, Pengzhou City
production line 1, designed capacity 4200tpd clinker.

The contract covers engineering, supply of equipment and supervision services for manufacturing, erection and commissioning. Production start-up of both plants is scheduled for second half of year 2006.

 

 

 

 

 

 

 



Picture caption:
Signing the contract for the production plants (left to right):
Andy H.J. Peng, President Jiangxi Ya-Dong Co. Ltd. and Tsai Hsiung Chang, Chairman Jiangxi Ya-Dong Co. Ltd. and Executive Board Director of Asia Cement Corp.; Rudolf Pich, CSO KHD Humboldt Wedag GmbH.