ACC Ltd, part of the Holcim Group, reported that its production in September rose by nine per cent to 1.82Mt from 1.67Mt in the same month of 2011. Dispatches reached 1.80Mt, compared with 1.73Mt, an increase of four per cent.
For the first nine months of this calendar year, cement production stood at 18.28Mt compared with 17.76Mt in the corresponding period last year, an increase of three per cent. Meanwhile, cement dispatches were 18.22Mt, up by two per cent from 17.79Mt in January-September 2011.
Sign up for our Daily News Service
Our editors' pick the top news delivered to your inbox each day.
Sign up for the daily email