Germany-based grinding specialist Gebr Pfeiffer has won the order for a vertical roller mill from Algematco Steel in Algeria.
Gebr Pfeiffer will deliver a ready2grind plant that is based on a MVR 2500 C-4 VRM with a SLS 2650 BC classifier and drives. In addition, the company will supply the feed module with material dosing and transport, plant filter, fan and hot gas generator as well as electrical switch gear with plant control system, silo plant, packing and palletising facilities and laboratory equipment.
The plant is designed to produce different types of cement at a production rate of 50-70tph. Erection and commissioning of the ready2grind facility are expected to take place at the start of 2020.