IKN has successful commissioned the new Southern Province Cement Co Bisha line 1 clinker cooler in Saudi Arabia. This is the conclusion of a very challenging project that started with the preassembly of the IKN equipment, directly followed by the shutdown, whereby the existing cooler was demolished and replaced by the latest generation IKN cooler.
The excellent collaboration between Sweden Industrial Services and IKN was key in bringing this endeavour to a successful close, working at full power in day and night shifts. The work as supported by an onsite team of Intermaint Group engineers during the preassembly and installation phase.